Superconductor Quenching Magnet Cooling Supply Work The magnet that will be used to quench the superconductor in our experiment is water cooled. So is its power supply. The water chiller that will provide the cooling was checked out and filled. The plumbing to the supply was constructed and tested. Two of the water lines required SwageLocks rather than Parker fittings to prevent leaks. The superconducting sample is to be placed in a liquid helium Dewar during the experiment. Work is being done to check the status of a second Dewar that can be used as a backup to the first. At present, the leak detector for this work is not functioning properly. Some time was spent on debug of the system with no conclusive answers found. New to the game? Scroll to the end for background on what this is all about. Leak Detector Debug Looking into why the leak detector no longer pulls down to < 10^-2 Torr quickly, (at all?). Cleaned th...